• Acting for a national civil engineering contractor in an arbitration arising out of the design and construction of a dangerous goods drainage system following the loss of 300 million litres of diesel from the system ($15 million plus claim in damages).
  • Acting for an engineering consultancy in an arbitration brought against it in connection with the design and project management of a bio-cogeneration facility.
  • Acting for an architect in a dispute concerning whether the design and construction of a high end residence complied with energy efficiency requirements within the Building Code of Australia.
  • Acting for a power company in relation to various bushfires that damaged properties in south west and central Western Australia.
  • Acting for a labour hire company against one of Australia's largest engineering contractors and one of Australia's largest miners in a dispute concerning a train derailment.
  • Acting for a local government in relation to a bushfire in the south west of Western Australia that caused four deaths and destroyed millions of dollars of damage to stock, crops, property and infrastructure.
  • Acting for a local government in relation a claim by an international corporation regarding a fire which severely burned several marathon competitors in 2011 ($20 million plus claim in damages).
  • Acting for local governments on a number of personal injury, professional indemnity and property damage disputes including in relation to a significant spinal injury claim ($21 million claim in damages).
  • Acting for a mine operator and power corporation in an action for injuries sustained while inside an electrical compound. The claim against the mines operator was successfully dismissed for procedural failures. The matter was heard against the power corporation in the District Court of Western Australia in February 2013. The plaintiffs claim was dismissed. ($2 million claim in damages).
  • Acting for a national construction company in a matter involving 55 claims for vibration damage following construction of a major Perth intersection. All claims were successfully settled prior to any formal proceedings.